Category(ies):
Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction |
Preliminary Advertisement -The I-81 Viaduct Project - Contract 3Description: NYSDOT Preliminary Advertisement of the I-81 Viaduct Project - Contract 3 The I-81 Viaduct Project (Community Grid) – contract 3 Business Loop 81 Northern Section – Phase 1, is the third contract related to the conversion of the section of I-81 between the southern I-81/I-481 Interchange (Interchange 16A) and the northern I-81/I-481 Interchange (Interchange 29) to Business Loop 81 (BL 81), and redesignation of the existing I-481 as I-81. This project will reconstruct Court St., Spencer St., and Bear St. bridges over existing I-81 and construct a new bridge from Bear St. to BL-81 NB, as well as reconstruct both N. Clinton St. and Genant Dr. from Genant Dr. to Bear St. Genant Dr. will be modified during the reconstruction and will no longer provide a continuous connection between Bear St. and N. Clinton St. New on and off ramps from BL-81 SB (existing I-81 SB) to N. Clinton St. will be constructed. Rehabilitation work on Bear St. is also included between BL-81 and I-690, and there will be pedestrian and bicycle improvements throughout the project area. The anticipated letting date for this project is November 2, 2023. Preliminary Plans are available at https://www.dot.ny.gov/portal/page/portal/doing-business/opportunities/const-notices Due Date: 11/02/2023 10:30 AMContract Term: See Proposal Location: Onondaga County Ad Type: General
|