Category(ies):
Construction Vertical: Building Construction; Rehabilitation & New Construction - Construction |
SUNY New Paltz Gage Hall Bathroom Renovations and Associated Asbestos and HAZMAT AbatementDescription: THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST ONLY, see the Eligibility Requirements further down in this document. DASNY is soliciting Expressions of Interest from Single Prime General Construction Contractors for the following Scope of Work to be performed at SUNY New Paltz, Gage Hall. The scope of work includes the demolition and reconfiguration of the existing bathrooms of Gage Hall to include new partitions, doors and hardware, finishes, fixtures, and toilet accessories. The scope of work also includes the reconfiguration of the sprinkler system into the bathrooms and replacement of the existing exhaust system with roof mounted Energy Recovery Ventilator system including supply and return ductwork. The project scope of work includes, but is not limited to: asbestos abatement, selective demolition, concrete, masonry, metals, interior finishes, openings, specialties, equipment, furnishings, roofing, fire suppression, plumbing, mechanical, electrical, communication, fire alarm, and sitework. It is anticipated that all work will be completed over the summer and fall of 2025 between approximately May 2025 and November 2025. The estimated Construction Cost is between $6,500,000 and $7,250,000. Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to ccontracts@dasny.org, with Tabs in the following sequence: Tab 1 - Documentation of a minimum of five (5) years experience in similar work and provide a list of five (5) projects of similar size scope and complexity to the referenced project, which have been completed, or substantially completed in the last ten (10) years. For each project, the following needs to be provided; project designer, firm name and contact information, project title and location/facility, a brief description of the project, total construction cost, and construction start and substantial completion date. Tab 2 - Three (3) samples of project schedules utilized for previous projects submitted in Tab 1 as documentation of similar size scope and complexity to the referenced project. Tab 3 - The table of contents of the firm’s written Safety Program. Tab 4 - The firm’s experience modification rating documentation issued by the Workers Compensation Board (EMR Rating). Tab 5 - Bonding Capacity documentation from Surety Company (single and aggregate). Tab 6 - A completed NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2). Electronic copies can be obtained from the Dormitory Authority, State of New York (DASNY) web site www.dasny.org. Tab 7 - Proposed project team with résumés. Tab 8 – List of Potential Subcontractors to be utilized on this Project. Demonstration of M/WBE participation must be identified. Tab 9 – Anticipated workload for the period during which this Project will be in Construction. 05/2025 to 11/2025 Due Date: 09/26/2024 2:00 PMContract Term: November 21, 2025 Location: SUNY New Paltz, Gage Hall, 1 Hawk Drive, New Paltz, New York 12561 Ad Type: General
|