BACK
Category(ies):

Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction

 
Issue Date: 09/09/2020 Contract Number: TBD

Replacement of Washington Drive Bridge over Fuller Hollow Creek


Description:

THIS CONTRACT IS FUNDED, WHOLLY OR IN PART, BY THE FEDERAL HIGHWAY
ADMINISTRATION AND THE NEW YORK STATE DEPARTMENT OF
TRANSPORTATION (NYSDOT). 

THE PROJECT WILL DEMOLISH THE EXISTING BRIDGE AND REPLACE WITH A  NEW STRUCTURE. ROADWAY APPROACH WORK, UTILITY WORK AND STREAM BANK WORK IS INCLUDED.

Due Date: 10/01/2020 2:00 PM

Contract Term: 1 year

Location: Adjacent to 4471 Washington Drive, Vestal, New York

Ad Type: General


Technical contact:     Delta Engineers, Architects & Land Surveyors, DPC


Tamer Osman
Senior Project Manager
860 Hooper Road
Endwell, NY 13760
United States
Ph: 607-231-6669
Fax: 607-231-6650
tosman@delta-eas.com

Primary Contact:     Vestal, Town of
Engineering
Engineering
Vernon Myers
Town Engineer
605 Vestal Parkway West
Vestal, NY 13850
United States
Ph: 607-786-0980 ext.209
Fax: 607-786-0984
vmyers@vestalny.com

Secondary contact:     Vestal, Town of
Engineering
Engineering
Vernon Myers
Town Engineer
605 Vestal Parkway West
Vestal, NY 13850
United States
Ph: 607-786-0980 ext.209
Fax: 607-786-0984
vmyers@vestalny.com