BACK
Category(ies):

Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction

 
Issue Date: 08/31/2020 Contract Number: PIN 5761.67

Abbott St. Resurfacing & Streetscape Improvements


Description:

The Owner is the City of Buffalo and the work site is located in the City of Buffalo. The project limits are Abbott Road from Southside Parkway to Meriden Street. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: insert Project description of work. Install all new curb, curb bump-outs, drainage structures, sidewalk and new traffic signals at Stevenson Street and Tamarack Street

Due Date: 09/23/2020 11:00 AM

Contract Term: 150 Working Days

Location: Abbott Rd. from Southside Pkwy to Meriden St.

Ad Type: General


Technical contact:     CHA Consulting, Inc.


Joseph Kleinmann, P.E.
Senior Project Engineer
2200 Main Place Tower
Buffalo, NY 14202
United States
Ph: 716-221-4303
Fax:
jkleinmann@chacompanies.com

Primary Contact:     Buffalo, City of
Public Works, Parks and Streets
Engineering
Tom Duk
Project Engineer
65 Niagara Square-City Hall
Room 502, City Hall
Buffalo, NY 14202
United States
Ph: 716-851-4076
Fax: 716-851-5576
tduk@city-buffalo.com

Secondary contact:     Buffalo, City of
Public Works, Parks and Streets
502 City Hall
Michael J. Finn, P.E.
Commissioner
65 Niagara Square-City Hall
Room 502, City Hall
Buffalo, NY 14202
United States
Ph: 716-851-5636
Fax: 716-851-5584
mfinn@city-buffalo.com