Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction

 
Issue Date: 08/28/2020 Contract Number: H18-171-P3

MASSAPEQUA FLOOD DIVERSION AND CONTROL PROJECT 3, BROCKMEYER DRIVE, CLEARWATER AVENUE AND IROQUOIS PLACE, MASSAPEQUA,NY


Description:

Under the guidance and assistance of GOSR, The Town of Oyster Bay intends to add drainage structures and increase pipe size to increase the capacity of the existing drainage systems in the Brockmeyer Drive, Clearwater Avenue, and Iroquois Place area. Stormwater treatment structures will be added to clean road runoff and inline check valves to prevent tidal backflow. A bioswale area will be created on the Brockmeyer Place drainage system to hold stormwater and remove contaminants and sediment. The dead end on Iroquois Place will be regrade to prevent ponding. All repairs will be made to curbs, sidewalks, driveways and the roadways will be milled and resurfaced. These improvements will address stormwater drainage issues and tidal backflow that has occurred during past storms and high tides.

Due Date: 09/25/2020 3:00 PM

Contract Term: 240 calendar days

Location: Massapequa, New York

Ad Type: General


Primary Contact:     Oyster Bay, Town of
Department of Public Works
Division of Engineering
Daniel Midgette
Project Manager
150 Miller Place
Syosset, NY 11791
United States
Ph: 516-677-5897
Fax:
dmidgette@oysterbay-ny.gov

Secondary contact:     Oyster Bay, Town of
Department of General Services

Jamie Conologue
Division of Purchase and Supply
74 Audrey Avenue
Oyster Bay, NY 11771
United States
Ph: 516-624-6100
Fax: