BACK
Category(ies):

Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction

 
Issue Date: 08/28/2020 Contract Number: H18-171-P5

MASSAPEQUA FLOOD DIVERSION AND CONTROL PROJECT 5 PHILADELPHIA AVENUE & ATLANTIC AVENUE


Description:

Under the guidance and assistance of GOSR, The Town of Oyster Bay intends to increase the available storage and detention in 3 storm water recharge basins (RBs,) within Massapequa Park.   Work will consist of removing material within these RBs and raising the outlet elevation controls in them.  The project also involves raising the roadway elevation on Philadelphia Ave between Front Street and Pennsylvania Avenue. This includes replacing existing drainage structures and adding an additional drainage outfall into the adjacent RB.  These improvements are to address ongoing flooding issues along Philadelphia Ave.

Due Date: 09/25/2020 3:00 PM

Contract Term: 150 calendar days

Location: Massapequa Park, New York

Ad Type: General


Primary Contact:     Oyster Bay, Town of
Department of Public Works
Division of Engineering
Daniel Midgette
Project Manager
150 Miller Place
Syosset, NY 11791
United States
Ph: 516-677-5897
Fax:
dmidgette@oysterbay-ny.gov

Secondary contact:     Oyster Bay, Town of
Department of General Services

Jamie Conologue
Division of Purchase and Supply
74 Audrey Avenue
Oyster Bay, NY 11771
United States
Ph: 516-624-6100
Fax: