Category(ies):
Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Miscellaneous - Construction Utilities & Green Energies - Construction |
Dryden Rail Trail Phase 2-Pedestrian Bridge over Route 13Description: Project is the construction of a pedestrian bridge to carry the Dryden Rail Trail over State Route 13 in the Town of Dryden and includes the approaches. Due Date: 05/08/2025 1:30 PMContract Term: 18 month Location: State Route 13 near Hall Road in Town of Dryden Ad Type: General
|