BACK
Category(ies):

Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction

Transportation, Bus, Rail, Marine & Aviation - Construction

 
Issue Date: 04/08/2025 Contract Number: C01085GG

Hubbs Road Multi-Use Path


Description:

This project includes construction of a new multi-use path along the south side of Hubbs Road in the Town of Clifton Park, Saratoga County, NY. The work will begin at the intersection of Hubbs Road with Dutch Meadow Drive to the intersection of Hatlee Road/Main Street, where the multi-use path terminates. Sidewalk construction begins on the west side of Main Street from the Hubbs Road / Hatlee Road intersection and continues to the intersection with Mac Elroy Road and Longkill Road. Project funding in part is from the Climate Smart Communities Grant Program, Title 15 of the Environmental Protection Fund, through the New York State Department of Environmental Conservation. There is an overall goal of 30% for Minority and Women-Owned Business Enterprises (MWBE) participation, based on the current availability of qualitifed MBEs and WBEs. For the purposes of providing meaningful participation by MWBEs on the contract and achieving goals, contractors should reference the directory of NYS Certified MWBEs at https://ny.newnycontracts.com Additionally, contractors should contact the Division of Minority and Women Business Development at (518) 292-5250, (212) 803-2414, or (716) 846-8200 to discuss maximizing participation by MWBEs on the contract. Contractors must document "good faith efforts" to provide meaningful participation by MWBES as subcontractors or suppliers in the performance of this contract.  This is a public works project and prevailing wages as determined by NYS Department of Labor must be paid.  Electronic copies of Contract Documents and to become a Registered Plan Holder please visit the MJ Engineering plan room at http://www.mjteam.com/bids

 

Due Date: 04/29/2025 3:00 PM

Contract Term: state grant contract ends 3/14/2026

Location: Hubbs Road and Main Street in northern Clifton Park

Ad Type: General


Technical contact:     MJ Engineering, Architecture, Landscape Architecture, and Land Surveying, P.C.
Engineering

Megan Bacon, PE
Project Manager
21 Corporate Drive
Clifton Park, NY 12065
United States
Ph: 518-371-0799
Fax:
mbacon@mjteam.com

Primary Contact:     Clifton Park, Town of
Planning
Planning
John Scavo
Director of Planning & Zoning
One Town Hall Plaza
Clifton Park, NY 12065
United States
Ph: 518-371-6054 ext.224
Fax: 518-371-1136
jscavo@cliftonpark.org

Secondary contact:     Clifton Park, Town of
Planning
Planning
Jennifer Viggiani
Open Space Coordinator
One Town Hall Plaza
Clifton Park, NY 12065
United States
Ph: 518-371-6054 ext.350
Fax: 518-371-1136
jviggiani@cliftonpark.org
Secondary contact:     Clifton Park, Town of
Town Clerk
Town Clerk's Office
Stephanie Ranze
Town Clerk
One Town Hall Plaza
Clifton Park, NY 12065
United States
Ph: 518-371-6681 ext.206
Fax: 518-383-5088
sranze@cliftonpark.org