Category(ies):
Facilities, Maintenance, Repair & Building Operations - Construction Professional Services |
W.O.R.K.S.Description: The State University of New York at SUNY Old Westbury will receive sealed bids for project number SOW11172025 titled W.O.R.K.S. until 2 p.m. local time on December 10, 2025, at SUNY Old Westbury, Campus Center, H-303, 223 Store Hill Rd., Old Westbury, NY 11568, where such proposals will be publicly opened and read aloud. All work on this Contract is to be completed within/by January 25, 2026. Complete sets of Contract Documents for bidding may be obtained from the NYSCR website or procurement@oldwestbury.edu
Procurement Calendar: NYSCR Advertisement Published: Monday 11/17/2025 Mandatory Site Walk: Tuesday 11/25/2025 at 1:30pm at Campus Center, Rm H220 Bidders’ Questions Due By: Monday 12/01/2025, 5pm College Responses Due By: Thursday 12/04/2025 Bids Due By: Wednesday 12/10/2025 2PM EST
A Mandatory Site Walkthrough will occur on Tuesday 11/25/2025 at 1:30pm meeting in Campus Center Building at Rm H220 __________________________________________________________________ Scope of Work The work to be done under the Contract, in accordance with the Contract Documents, consists of performing, installing, furnishing and supplying all materials, equipment, labor and incidentals necessary or convenient for the construction of Project Number __________, titled ___W.O.R.K.S____Project________________ and carry out all of the duties and obligations imposed upon the Contractor by the Contract Documents.
The main features of the work shall include, but not be limited to the following:
SUNY Old Westbury is soliciting bids to update rooms in the Campus Center building on the second floor. This project will update Rooms H213, H216, H220, H222, H213–Painting Accent walls in each office, H216 A conference room will have installed a 55” Television This will include painting, adding electrical wiring and single-gang data boxes, H220 & H222 upgrading a classroom with new technology, repair floor tiles and painting
You will be working in concert with the computer networking team
General Requirements:
Entryway to H220 & H222
Objective: Install electric, network cable boxes for 55” CreateBoard
Install One (1)Duplex outlet box 18” down from Fire alarm and 85” from Right side wall for a 55” Createboard
Use existing circuits for electricity
Install one (1) single-gang data box with 3/4" EMT conduit run to the Ceiling for network cabling. Prepare wall for painting (Spackle, tape, sand, Prime).as needed Paint wall Sherwin Williams – Koi Pond – HGSW7727
Room H220:
Objective: Renovate the classroom with new technology, paint, flooring and Electrical
Front wall
Right side wall
Room H222: Objective: Renovate the classroom with new paint, flooring, and Electrical
Front wall
The selected contractor must ensure all electrical work supports the above devices, including the installation of outlets, circuits, and any necessary load balancing in accordance with code requirements
Schedule This work is to be started & completed Between December 2025 and January 2026
The selected contractor must ensure all work is supported and works well without defect
Due Date: 12/10/2025 2:00 PM Contract Term: 60 days Location: SUNY Old Westbury, Campus Center Ad Type: General
|