Category(ies):
Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction |
FRMC F Lot ExpansionDescription: Fuller Road Management Corporation is seeking a qualified, experienced, construct a 700 to 750-space parking area south of the existing F-lot parking area. This construction shall be based on the IFB design documents, noted as Exhibit A. This construction bid document shall be seen as ready for bid, with the final document being prepared. The scope includes storm water management, underground electrical conduits, and grading. There will be a mandatory site visit that you must attend on 03/14 with the Contract Term: 0 Location: 257 Fuller Road Albany, NY 12203 Ad Type: General
|