Category(ies):
Transportation, Bus, Rail, Marine & Aviation - Construction Architectural, Engineering & Surveying - Construction Professional Services Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction |
Taxiway D, H & G ReconfigurationDescription: The proposed project generally includes the reconfiguration of Taxiway D to provide 90 degree turns to eliminate direct access from the Terminal Apron onto Runway 15-33 via Taxiway D. The project will include removal of Taxiway H. Taxiway D (south of Taxiway A) will be reconfigured further east. Taxiway G will remain as-is and the turf islands will be regraded for stormwater conveyance. Non-conforming concrete pavement will be removed and converted to turf. The project will include new taxiway edge lights, airfield guidance signs, conduit and cable. All turf areas will be regraded to allow for proper drainage. Stormwater piping and catch basins will be installed, however the existing drainage patterns will be maintained. Reconfigured Taxiway D will be approximately 35 feet wide and 250 feet in total length. The project includes 69,450 square feet of permanent pavement removal. Due Date: 03/25/2025 1:30 PMContract Term: 30 Calendar Days Location: 660 Hangar Road, Suite 223, Rome, NY 13441 Ad Type: General
|