Category(ies):
Utilities & Green Energies - Construction |
3rd Ave Pressure Reducing Valve & Meter Vault ReplacementDescription: The project includes installing Hyrda-stop Insta-valves, proposed 8" and 16" ductile iron water mains and fittings, new pressure reducing valve and meter vault, abandoning existing check valve manhole and existing pressure reducing valve and meter vaults with flowable fill, and reestablishing turf in any areas disturbed during construction. Due Date: 04/02/2025 10:00 AMContract Term: TBD Location: The City of Rensselaer Ad Type: General
|