BACK
Category(ies):

Utilities & Green Energies - Construction

 
Issue Date: 03/12/2025 Contract Number: TBD

3rd Ave Pressure Reducing Valve & Meter Vault Replacement


Description:

The project includes installing Hyrda-stop Insta-valves, proposed 8" and 16" ductile iron water mains and fittings, new pressure reducing valve and meter vault, abandoning existing check valve manhole and existing pressure reducing valve and meter vaults with flowable fill, and reestablishing turf in any areas disturbed during construction.

Due Date: 04/02/2025 10:00 AM

Contract Term: TBD

Location: The City of Rensselaer

Ad Type: General


Technical contact:     Creighton Manning


Greg Beswick
P.E. - Project Manager
2 Winners Circle
Albany, NY 12205
United States
Ph: 518-689-1815
Fax:
GBeswick@cmellp.com

Primary Contact:     Rensselaer, City of
Engineering
Engineering
Bill Smart
City Engineer
62 Washington St.
Rensselaer, NY 12144
United States
Ph: 518-948-0161
Fax:
bill.smart@rensselaerny.gov

Secondary contact:     Rensselaer, City of
City Clerk
Clerk
Nancy Hardt
City Clerk
62 Washington St.
Rensselaer, NY 12144
United States
Ph: 518-462-4266
Fax:
Nancy.Hardt@RENSSELAERNY.GOV