BACK
Category(ies):

Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Consulting & Other Services

Miscellaneous - Consulting & Other Services

Transportation, Bus, Rail, Marine & Aviation - Consulting & Other Services

 
Issue Date: 02/14/2025 Contract Number: D900061

DESIGN?BUILD SERVICES FOR I-81 VIADUCT PROJECT – PHASE 2, CONTRACT 6


Description:

LETTER OF INTENT

 

DESIGN?BUILD SERVICES FOR I-81 VIADUCT PROJECT – PHASE 2, CONTRACT 6

PIN 3501.95           Contract # D900061

 

THE   NEW   YORK   STATE   DEPARTMENT   OF   TRANSPORTATION (NYSDOT) WILL ISSUE A REQUEST FOR QUALIFICATIONS (RFQ) TO OBTAIN A STATEMENT OF QUALIFICATIONS (SOQ) FROM FIRMS INTERESTED IN PROVIDING DESIGN?BUILD SERVICES FOR I-81 VIADUCT PROJECT – PHASE 2, CONTACT 6 LOCATED IN REGION 3 IN ONONDAGA COUNTY. 

 

This contract has an estimated value of $750 – 900 million.

 

The I-81 Viaduct Project – Phase 2, Contract 6, continues construction of the Community Grid Alternative by reconstructing approximately 1.3 miles of I-690 from Leavenworth Avenue to Irving Avenue including reconstruction of the West Street/West Genesee Street interchange (existing exit 11/12), reconstruction of the I-690/I-81 interchange to become the I-690/Proposed Business Loop 81 (BL 81) interchange, removal of the Townsend Street/McBride Street partial interchange, and construction of the Irving Avenue components of the Irving Avenue/Crouse Avenue interchange.  The work envisioned for this project will:

 

  • Reconstruct the existing I-690 interchange with West Street and West Genesee Street including:
    • Replace the existing, free-flow interchange with a new signalized interchange.
    • Demolish the existing ramp connecting Franklin Street and Butternut Street to West Street southbound.
    • Demolish the existing ramp connecting I-690 westbound to West Street southbound.
    • Demolish the existing ramp from I-690 eastbound to West Genesee Street and southbound West Street.
    • Demolish the existing ramps connecting West Street northbound to Herald Place, I-690 westbound, and I-690 eastbound.
    • Demolish the existing West Street northbound and southbound bridges over West Genesee Street and replace the existing grade-separated crossings with an at-grade, signalized intersection.
    • Demolish the existing ramp connection from Tracy Street to West Street southbound.
    • Reconstruct West Street from the Erie Boulevard bridge over West Street to West Genesee Street including reconstruction of the West Street northbound ramps to and from Erie Boulevard; construction of a new West Street southbound intersection with Park Ave; construction of a new West Street southbound ramp connection to Tracy Street; and construction of a new at-grade, signalized intersection with West Genesee Street.
    • Reconstruct West Street from West Genesee Street to I-690 including construction of a new West Street northbound ramp to I-690 eastbound, West Street northbound ramp connection to I-690 westbound, I-690 eastbound ramp to West Street southbound, and I-690 westbound ramp connection to West Street southbound.
    • Reconstruct and widen West Genesee Street from Plum Street to Wallace Street with two (2) travel lanes in each direction, left turn lane onto West Street, a center median, new and replacement traffic signals and sidewalks.
    • Construct multiple multiuse trails along Onondaga Creek between Erie Blvd and Evans Street.    
    • Construct a sidewalk along the east and west sides of West Street from Park Street to West Genesee Street.
    • Construct the West Street and Genesee Street Gateway by incorporating pedestrian, bicycle, visual and landscape features and connectivity into the design of the at-grade West Street/Genesee Street intersection.

 

  • Reconstruct the existing I-690/I-81 interchange to become the I-690/Proposed BL 81 interchange including:
    • Reconstruct and reconfigure the interchange to accommodate removal of the existing I-81 viaduct to the south, the conversion of I-81 to BL 81, and other ramp and access modifications adjacent to the interchange area. The portion of proposed Bl 81 (former I-81) north of the interchange will be reconstructed under a separate project, I-81 Phase 2, PIN 350196, design and construction coordination will be required between the two (2) contracts.
    • Demolish the existing ramps from I-81 northbound to I-690 eastbound and westbound.
    • Demolish the existing ramp from I-81 southbound to I-690 eastbound.
    • Demolish the existing ramp from I-690 eastbound to I-81 southbound.
    • Demolish the existing ramps from I-690 westbound to I-81 northbound and southbound.
    • Construct a new ramp from BL 81 southbound to I-690 eastbound.
    • Construct a new ramp from I-690 westbound to BL 81 northbound.

 

  • Reconstruct the proposed BL 81 (former I-81) Interchange 19 with Clinton Street/Salina Street and Interchange 20 with Franklin Street/West Street/Butternut Street including:
    • Reconstruct and reconfigure existing partial Interchanges 19 and 20 into a single interchange.
    • Demolish the existing ramps from I-81 southbound to Clinton Street/Salina Street and to Franklin Street/West Street/Butternut Street.
    • Construct a new combined ramp from BL 81 southbound to Clinton Street and Oswego Boulevard.
    • Construct Oswego Boulevard from the BL 81 southbound ramp to Erie Boulevard with at grade intersections with East Willow Street, James Street and Erie Boulevard.
    • Construct the BL 81 northbound on ramp and local street connection along Pearl Street northbound from Erie Boulevard to BL 81 with intersections at Erie Boulevard, James Street and East Willow Street.
    • Reconstruct the existing loop ramp from Pearl Street southbound to BL 81 northbound.  
    • Extend North Clinton Street to Butternut Street.
    • Reconstruct Websters Landing and portions of Evans Street.

 

  • Existing I-690 Interchange with Townsend Street and McBride Street:
    • Remove and replace the existing partial interchange with a full interchange at Irving and Crouse Avenues.
    • Demolish the existing ramp from I-690 westbound to Townsend Street.
    • Demolish the existing ramp from McBride Street to I-690 eastbound.

 

  • Complete the construction of a full interchange at Irving and Crouse Avenues:
    • Construct a new ramp from I-690 eastbound to Irving Avenue southbound with a new at-grade intersection at the Irving Avenue intersection with Erie Boulevard.
    • Construct a new ramp from Irving Avenue northbound to I-690 westbound.
    • Construct a westbound service road along the north side of I-690 between Crouse and Irving Avenues to connect the I-690 westbound off ramp at Crouse Avenue to the I-690 westbound on ramp at Irving Avenue.

 

  • Construct the new storm water drainage system from West Street to Onondaga Creek.

 

This project will include bridge work as described in the below table.  Bridges within the project are not listed below either have no work planned or will be addressed under separate contracts:

 

 

No.

BIN/ST NO.

Feature Carried/Crossed

Proposed Work

1

1050779

I-690 EB/WB OVER LEAVENWORTH AVENUE

Rehabilitation - Widen bridge deck

2

2208560

WEST GENESEE ST OVER ONONDAGA CREEK

Minor Rehabilitation

3

1050001

SB N WEST STREET OVER ROUTE 5 (ERIE BLVD.)

Removed

4

1050002

NB N WEST STREET OVER ROUTE 5 (ERIE BLVD.)

Removed

5

1050780

WEST STREET NB TO I-690 WB OVER I-690

Removed

6

1050790

I-690 WB TO WEST STREET SB OVER I-690

Removed

7

1050800

BUTTERNUT STREET TO SB N WEST STREET OVER ONONDAGA CREEK

Removed

8

105080A

I-690 WB TO WEST STREET SB RAMP OVER ONONDAGA CREEK

Removed

9

1050821

I-690 WB OVER ONONDAGA CREEK

Removed

10

1050822

I-690 EB OVER ONONDAGA CREEK

Removed

11

1050840

NB WEST STREET TO I-690 EB RAMP OVER ONONDAGA CREEK

Removed

12

1050010

NB N WEST STREET RAMP TO HERALD PLACE OVER ONONDAGA CREEK

Removed

13

1050851

I-690 WB OVER FRANKLIN ST

Removed

14

1050852

I-690 EB OVER FRANKLIN ST

Removed

15

1054020

I-690 WB OVER CLINTON ST RAMP

Removed

16

1008489

NB/SB I-81 OVER N SALINA STREET

Removed

17

1050910

I-690 WB OVER SALINA ST TO WILLOW ST

Removed

18

1095510

WB I-690 OVER I-81

Removed

19

1050921

I-690 WB RAMP TO I-81 NB OVER WILLOW STREET

Removed

20

1050922

I-690 WB OVER WILLOW STREET

Removed

21

105388A

FORMER I-81 SB TO I-690 EB RAMP OVER JAMES STREET

Removed

22

1053881

SB I-81 OVER E WILLOW, JAMES AND N STATE STREETS

Removed

23

1053882

NB I-81 OVER E WILLOW, JAMES AND N STATE STREETS

Removed

24

1051000

I-690 EB OVER CLINTON ST TO TOWNSEND ST

Removed

25

1050950

WB I-690 OVER N CLINTON, N SALINA, E WILLOW, JAMES, AND N STATE

Removed

26

105095A

NB I-81 RAMP TO WB I-690 OVER N STATE STREET

Removed

27

105100A

EB I-690 RAMP TO SB I-81 OVER N STATE STREET

Removed

28

1051030

I-690 WB OVER TOWNSEND ST

Removed

29

1053860

SB I-81 OVER TOWNSEND STREET

Removed

30

1053870

NB I-81 OVER N TOWNSEND STREET

Removed

31

1051050

I-690 WB OVER MCBRIDE STREET

Removed

32

1064590

WB I-690 RAMP TO SB I-81 OVER E FAYETTE, E WASHINGTON, E WATER, ROUTE 5 AND ALMOND STREETS

Removed

33

1051061

I-690 WB OVER CATHERINE STREET

Removed

34

1051062

I-690 EB OVER CATHERINE STREET

Removed

35

1051063

MCBRIDE STREET TO EB I-690 RAMP OVER CATHERINE STREET

Removed

36

105384A

NB I-81 RAMP TO EB I-690 RAMP OVER ROUTE 5 (ERIE BOULEVARD)

Removed

37

1053840

NB I-81 OVER ROUTE 5 (ERIE BOULEVARD)

Removed

38

Former 1074650

Concrete filled vault

Removed

39

2267910

EVANS ST OVER ONONDAGA CREEK

Replace

40

ST1

I-690 EB OVER CLINTON STREET TO STATE STREET

New Bridge

41

ST2

I-690 WB OVER CLINTON STREET TO STATE STREET

New Bridge

42

ST3

I-690 WB TO BL 81 NB RAMP

New Bridge

43

ST4

BL 81 SB OFF RAMP OVER SALINA STREET

New Bridge

44

ST5

BL 81 SB TO I-690 EB RAMP

New Bridge

45

ST6

I-690 WB OFF RAMP OVER CLINTON STREET

New Bridge

46

ST7

I-690 WB RAMP TO I-81 NB OVER SALININA STREET

New Bridge

47

ST8

I-690 EB OVER TOWNSEND STREET AND MCBRIDE STREET

New Bridge

48

ST9

I-690 WB OVER TOWNSEND STREET AND MCBRIDE STREET

New Bridge

49

ST10

I-690 EB OVER CATHERINE STREET

New Bridge

50

ST11

I-690 WB OVER CATHERINE STREET

New Bridge

51

ST12

I-690 EB OVER IRVING

New Bridge

52

ST13

I-690 WB OVER IRVING

New Bridge

53

ST14

I-690 EB OVER WEST STREET

New Bridge

54

ST15

I-690 WB OVER WEST STREET

New Bridge

55

ST16

EVANS STREET OVER ONONDAGA CREEK

New Bridge

56

ST17

I-690 EB RAMP OVER ONONDAGA CREEK

New Bridge

57

ST18

I-690 EB OVER ONONDAGA CREEK

New Bridge

58

ST19

I-690 WB OVER ONONDAGA CREEK

New Bridge

59

ST20

I-690 WB RAMP OVER ONONDAGA CREEK

New Bridge

60

ST21

I-690 WB OVER FRANKLIN STREET

New Bridge

61

ST22

I-690 EB OVER FRANKLIN STREET

New Bridge

62

ST23

I-690 WB RAMP OVER FRANKLIN STREET

New Bridge

63

ST24

I-690 EB RAMP OVER FRANKLIN STREET

New Bridge

64

ST25

I-81 NB ON RAMP FROM PEARL STREET

New Bridge

 

 

 

 

A Best Value selection process will be used that will have two steps. A Request for Qualifications (RFQ) is anticipated to be issued in April 2025. Responses to the RFQ will be evaluated to establish a listing of Design?Build firms that will be invited to submit Proposals in response to a Final Request for Proposals (RFP), scheduled to be issued in September 2025. The “Best?Value” selection process will evaluate the ability of the Design?Builder to manage the Design?Build process, design, construct and control the Project to provide a quality product, on or ahead of schedule, for a reasonable lump sum price within the Department’s project budget.

 

The RFQ will establish the pre?qualification process for the firms seeking to be short?listed as proposers and will provide full details of the Statement of Qualifications (SOQ) required from interested firms.

 

Subject to the requirements and limitations set forth in the Stipend Agreement, to be included in the RFP, the Department anticipates paying a stipend to each stipend-eligible Proposer who submits a Proposal in response to the RFP as compensation for its work product. The stipend will be an amount equal to 50% of the Proposer’s total qualified costs up to a maximum anticipated amount of $1,800,000.

 

The Department reserves the sole right, without incurring any liability, to change any aspect of the proposed procurement described above, including the right to not proceed with the procurement and/or right to proceed in a different manner or on a different timeline than as described above.

 

All bid documents and amendments related to this project procurement will be posted on https://www.dot.ny.gov/main/business-center/designbuildproject61

 

Potential bidders are advised that under New York State Finance Law, communication on procurements can be made only with designated contact persons. The contact persons for this procurement are:

 

 

Dawn Turgeon and Patricia Kappeller

Attention:  I-81 Viaduct Project – Phase 2, Contract 6

Office of Contract Management

New York State Department of Transportation

50 Wolf Road, 6th Floor

Albany, New York 12232, USA

Email: Dawn.Turgeon@dot.ny.gov and Patricia.Kappeller@dot.ny.gov

Due Date: 07/11/2025 12:00 PM

Contract Term: TBD

Location: Onondaga County

Ad Type: General


Primary Contact:     Transportation, NYS Dept. of
Office of Contract Management

Dawn Turgeon
CMS 2
50 Wolf Rd, 6th Floor
Albany, NY 12232
United States
Ph: 518-485-1824
Fax:
dawn.turgeon@dot.ny.gov

Secondary contact:     Transportation, NYS Dept. of
Office of Contract Management

Dawn Turgeon
CMS 2
50 Wolf Rd, 6th Floor
Albany, NY 12232
United States
Ph: 518-485-1824
Fax:
dawn.turgeon@dot.ny.gov