Issue Date: 03/14/2024 |
Contract Number: C040002 |
Switchgear Hardware and Software Upgrade
Description:
Upgrade PLC's to M340 Unity with HMI, utilizing Windows 10 compatible current Iconics software including remote panel and upgrade two HMI's in the existing generator paralleling switchgear system. This includes updating the following: all drawings, software, communication, data map, O&M manual, and functionality test in the factory.
- Verify system operation with existing hardware/software to ensure the system operates per the published sequence of operation
- Install any components and wires in anticipation of the hardware upgrade
- Update PLC, HMI hardware and software
- Verify communications and mapping is correct
- verify system sequences are load shares per installed program utilizing load bank
- Install protective relay upgrade kits
- Record system settings
- Perform training as required
There will be a mandatory site visit 3/28/24, questions will be due 4/4/24, answers will be due 4/11/24.
Due Date: 04/18/2024 12:00 PM
Contract Term: 1 year
Location: Great Meadow Correctional Facility
Ad Type: Discretionary procurements between $50,000 and $750,000
Primary Contact:
|
Corrections and Community Supervision, NYS Dept. of
Great Meadow Correctional Facility
Business Office
Carla Thompson
Institution Steward
11739 State Route 22 Comstock, NY 12821 United States
Ph: 518-639-5516 ext.3100
Fax: 518-639-5516
Carla.Thompson@doccs.ny.gov
|
Secondary contact:
|
Corrections and Community Supervision, NYS Dept. of
Great Meadow Correctional Facility
Plant Operations
Roger Willingham
Plant Superintendent
11739 State Route 22 Comstock, NY 12821 United States
Ph: 518-639-5516 ext.3950
Fax:
Roger.Willingham@doccs.ny.gov
|
Secondary contact:
|
Corrections and Community Supervision, NYS Dept. of
Great Meadow Correctional Facility
Business Office
Carla Thompson
Institution Steward
11739 State Route 22 Comstock, NY 12821 United States
Ph: 518-639-5516 ext.3100
Fax: 518-639-5516
Carla.Thompson@doccs.ny.gov
|
|