Category(ies):
Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction |
Orange Turnpike, Pine Tree Road, Still Road, and Stage Road Traffic Signal InstallationDescription: Bids will be received for the following Contract: Orange Turnpike, Pine Tree Road, Still Road, and Stage Road Traffic Signal Installation This work includes the installation of a traffic signal at the intersection of Orange Turnpike, Pine Ridge Road, Stage Road, and Still Road. Construction will include work zone traffic control, traffic signal installation, installation of subbase and asphalt pavement, drainage structure modification, signing, pavement striping, and box beam guide railing installation. The owner of this contract is the Village of Monroe. Due Date: 05/08/2025 11:00 AMContract Term: 240 Calendar Days Location: Intersection of Orange Turnpike, Pine Tree Road, Still Road, and Stage Road T Ad Type: General
|