Issue Date: 04/10/2025 |
Contract Number: TBD |
REMOVE / REPLACE existing Roof
Description:
PERMIT, inspection, materials and disposal to be the responsibility of the subcontractor.
Subcontractor must follow all current safety protocol and is responsible for general job site safety and security.
Demolition:
- Protect existing structure, shrubs, and personal property during removal, taking caution to keep all entrances free of hazards.
- Remove existing shingles
- Remove existing drip edge and flashing.
- Remove existing underlayment.
- Remove and repair/replace all rotted decking. PROVIDE COST PER SHEET FOR REPLACING DECKING with 5/8” CDX, or matching existing roof decking.
- Remove all GUTTERS - Metal Fascia and soffit at eaves and rakes on entire perimeter of roof.
- Remove roof sheathing on side addition and replace with 5/8” CDX plywood.
- All materials removed shall be the responsibility of the subcontractor to properly dispose of. Site shall be left free of nails and other debris and all landscaping/lawn areas shall be restored to their pre–construction status.
Installation:
- Furnish and install new aluminum drip edge along all eaves and rakes, nailed in place.
- Furnish and install ice and water shield along eaves per current and local code.
- Flashings shall be installed in a manner that prevents moisture from entering the wall and roof through joints in copings, through moisture permeable materials and at intersections with parapet wallsand other penetrations through the roof plane.
- Furnish and install new synthetic underlayment, lapped min. 6 in. at horizontal seams and min. 4 in. at vertical seams (or as per manufactured specs).
- Furnish and install new 30-year architectural roof shingles per manufacturer instructions on all appropriately pitched roofs.
- Install self-adhesive or like replacement, on low pitched roofs.
- Color will be verified with Agency/Owner. Brown or Black only
- Nails shall be double hot-dipped galvanized roofing nails of sufficient length to fully penetrate roof sheathing and applied with at least 5 nails per shingle or nail pattern as recommended by manufacturer.
- Furnish and install new ridge vent with shingle cap.
- Furnish and install new roof boots, vents, etc. for all roof penetrations following manufacturer’s instructions or generally accepted construction practices.
- Install vinyl perforated soffit at all eaves and rakes. Color to be verified prior to installation.
- Install seamless gutters both front and rear with leader drains. Color to be verified prior to installation.
- Subcontractor will follow all manufacturers recommended installation procedures.
- Upon completion, site will be broom cleaned and all demolition and construction debris will be removed from site.
- Subcontractor to be responsible for all safety training, protocol and work practices.
- Subcontractor to be responsible for all safety training, protocol and work practices.
I
Due Date: 05/01/2025 3:00 PM
Contract Term: 1 year
Location: 314 PINE ST SAUGERTIES NY 12401
Ad Type: General
Primary Contact:
|
Ulster County Community Action
weatherization
michael rosinski
project managee
70 lindsley ave kingston, NY 12401 United States
Ph: 845-264-9713
Fax:
mgrwx1@gmail.com
|
Secondary contact:
|
Ulster County Community Action
weatherization
michael rosinski
project managee
70 lindsley ave kingston, NY 12401 United States
Ph: 845-264-9713
Fax:
mgrwx1@gmail.com
|
|