BACK
Category(ies):

Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction

 
Issue Date: 04/25/2025 Contract Number: IFB# C2415

Courtyard bicycle shelters


Description:

STL courtyard bicycle shelter structure install.

 

The SUNY New Paltz campus is currently looking to install (3) bicycle shelters in our Sojourner Truth Library courtyard.  Part of this work involves providing and installing the steel structure for the 3 bicycle structures.  This installation will require fabrication, delivery and installation of steel structure as per the design drawings.  Shop drawings and field measurements will be required as part of this contract.  Reinforced concrete footings are already in place, however this contract will also require installation of anchor bolts as part of the steel installation.  The detailed extent of this work is outlined in the accompanying plans and specifications. All work will need to be coordinated with the onsite general contractor and Campus. 

Due Date: 05/19/2025 2:00 PM

Contract Term: single occurrence

Location: SUNY New Paltz

Ad Type: General


Primary Contact:     State University of New York (SUNY)
SUNY New Paltz
Purchasing Dept - HAB 307
Elissa Greene
Contract Administrator
1 Hawk Drive
New Paltz, NY 12561-2443
United States
Ph: 845-257-3309
Fax: 845-257-3388
greenee@newpaltz.edu

Secondary contact:     State University of New York (SUNY)
SUNY New Paltz
Purchasing Dept - HAB 307
Elissa Greene
Contract Administrator
1 Hawk Drive
New Paltz, NY 12561-2443
United States
Ph: 845-257-3309
Fax: 845-257-3388
greenee@newpaltz.edu